January 2007

2007 MASTER FORMAT™ SECTION 08 45 23

(Previously section 08950)

INSULATED TRANSLUCENT FIBERGLASS SANDWICH PANEL SKYLIGHT SYSTEM

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes the insulated translucent sandwich panel skylight system as shown and specified. Work includes providing and installing:

B. Related Sections:

1.2 SUBMITTALS

A. Submit manufacturer’s product data. Include construction details, material descriptions, profiles and finishes of skylight components.

B. Submit shop drawings. Include plans, details, dimensions and attachments to other work.

C. Submit manufacturer's color charts showing the full range of colors available for factory finished aluminum.

D. Submit Installer Certificate, signed by installer, certifying compliance with project qualification requirements.

E. Submit product test reports from a qualified independent testing agency indicating each type and class of skylight panel system complies with the project performance requirements, based on comprehensive testing of current products. Previously completed test reports will be acceptable if for current manufacturer and indicative of products used on this project.

F. Submit current documentation indicating regular, independent quality control monitoring under a nationally recognized building code review and listing program.

1.3 QUALITY ASSURANCE

A. Manufacturer's Qualifications

B. Installer’s Qualifications: Installation shall be by an experienced installer, which has been in the business of installing specified skylight systems for at least five (5) consecutive years and can show evidence of satisfactory completion of projects of similar size, scope and type.

C. Performance Requirements: The manufacturer shall be responsible for the configuration and fabrication of the complete skylight panel system.

1.4 DELIVERY STORAGE AND HANDLING

A. Deliver skylight system, components and materials in manufacturer's standard protective packag­ing.

B. Store skylight panels on the long edge, several inches above the ground, blocked and under cover in accordance with manufacturer's storage and handling instructions.

1.5 WARRANTY

A. Submit manufacturer's and installer's written warranty agreeing to repair or replace skylight system work which fails in materials or work­manship within one (1) year of the date of delivery. Failure of mater­ials or workmanship shall include leakage, excessive deflection, deterio­ration of finish on metal in excess of normal weathering and defects in accessories, insulated translucent sandwich panels and other components of the work. (Contact local representative for extended warranty periods.)

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Kalwall Corporation, tel: (800) 258-9777

B. Structures Unlimited, Inc., tel: (800) 225-3895

2.2 PANEL COMPONENTS

A. Face Sheets

B. Grid Core

C. Laminate Adhesive

2.3 PANEL CONSTRUCTION

A. Provide sandwich panels of flat fiberglass reinforced translucent face sheets laminated to a grid core of mechanically interlocking thermally broken (aluminum) I-beams. The adhesive bonding line shall be straight, cover the entire width of the I-beam and have a neat, sharp edge.

B. Panels shall deflect no more than 1.9” at 30 psf in 10’-0” span without a supporting frame by ASTM E-72.

C. Panels shall withstand 1200ºF fire for minimum one (1) hour without collapse or exterior flaming.

D. Thermally broken panels:

E. Skylight system shall pass Class A Roof Burning Brand Test by ASTM E108. (OR Skylight system shall be UL listed as a Class A Roof by UL 790 which requires periodic unannounced inspections and retesting by Underwriters Laboratories.)

2.4 BATTENS AND PERIMETER CLOSURE SYSTEMS

A. Closure system: Extruded aluminum 6063-T6 and 6063-T5 alloy and temper clamp-tite screw type closure system. (Curved closure system may be roll formed.)

B. Sealing tape: Manufacturer's standard, pre-applied to closure system at the factory under controlled conditions.

C. Fasteners: 300 series stainless steel screws for aluminum closures, excluding final fasteners to the building.

D. Finish: Exposed aluminum to be manufacturer’s factory applied finish that meets the performance requirements of AAMA 2604. (Mill)

PART 3 - EXECUTION

3. EXAMINATION

A. Examine substrates, supporting structure and installation conditions. Do not proceed with skylight erection until unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Metal Protection:

3.3 INSTALLATION

A. Install the skylight system in accordance with the manufacturer's installation recommendations and approved shop drawings.

1. Anchor component parts securely in place by perma­nent mechanical attachment system.
2. Accommodate thermal and mechanical movements.

3. Set sill and curb members in a full bed of sealant compound, or with joint fillers or gaskets to provide weather-tight construction.

B. Install joint sealants at perimeter joints and within the skylight system in accordance with manufacturer's installation instructions.

3.4 FIELD QUALITY CONTROL

A. Water Test: Test skylights according to procedures in AAMA 501.2.

B. Repair or replace work that does not pass testing or that is damaged by testing and retest work.

3.5 CLEANING

A. Clean the skylight system inside and outside, immediately after installation, according to manufacturer's written recommendations.